Community Corner

PennDOT Roadwork Starting Aug. 27

PennDOT announces its roadwork schedule for Lehigh County during the coming week.

Upper Macungie Township:

Schantz Road between Adams Road and Grim Road. Lane restriction with flagging for base repair. Watch for stopped vehicles and use caution when traveling through work area.  START DATE: 08/29/2012  Est. Completion Date: 08/29/2012 Restrictions in effect 7 a.m. to 3 p.m.

Schantz Road between PA 863 AND PA 100. Lane Restrictions with flagging for shoulder cutting. Watch for stopped vehicles and use caution when traveling through work area. START DATE: 08/27/2012  Est. Completion Date: 08/28/2012 Restrictions in effect 7 a.m. to 3 p.m.

Find out what's happening in Upper Macungiewith free, real-time updates from Patch.

Allentown:

Tilghman Street between PA 145 and Front Street. Inspection Work. Eastbound lane restriction 9 a.m. to noon. Westbound lane restriction noon to 3 p.m.  Flaggers will be required. START DATE: 08/30/2012  Est. Completion Date: 08/30/2012 Restrictions in effect: 9 a.m. to 3 p.m.

Find out what's happening in Upper Macungiewith free, real-time updates from Patch.

Lynn Township:
Donats Peak Road between Clover Road and Kistler Valley. Lane restriction with flagging for pipe cleaning. Watch for stopped vehicles and use caution when traveling through work area. START DATE: 08/30/2012  Est. Completion Date: 08/31/2012 Restrictions in effect: 7 a.m. to 3 p.m.

Upper Saucon Township:

PA 309 at Interstate. Lane shift on shoulder. START DATE: 08/27/2012  Est. Completion Date: 08/27/2012 Restrictions in effect: 9 a.m. to 3 p.m.

Bethlehem:

PA 378 between PA 412 and Catasauqua Road. Inspection Work being Daytime restricton 8/27 and 8/28 northbound lane restriction. Southbound lane restriction. 8/29 & 9/5 Southbound lane restriction. START DATE: 08/27/2012  Est. Completion Date: 09/05/2012 Restrictions in effect: 9 a.m. to 3 p.m.

Catasauqua Boro

Bridge Street between Lehigh Street and Front Street. Bridge Repair. Lane restriction with flagging. Please use caution when traveling through work area. START DATE: 08/27/2012  Est. Completion Date: 08/27/2012. Restrictions in effect: 7 a.m. to 3 p.m.

North Whitehall-Heidleberg Townships:

Neffs-Laury Road between Irvan Road and Old Post Road Type of Work: Milling. Lane restriction with flagging. Watch for stopped vehicles and use caution when traveling through work area.  START DATE: 08/27/2012  Est. Completion Date: 08/31/2012. Restrictions in effect: 7 a.m. to 3 p.m.

Heidleberg-Weisenberg Townships:

Werley Corner Road between Camp Meeting Road and Holbens Valley. Bridge Repair. Lane restriction with flagging. Please use caution when traveling through work area. START DATE: 08/28/2012  Est. Completion Date: 08/31/2012. Restrictions in effect 7 a.m. to 3 p.m.

Route 22:

South Whitehall Township

US 22 between PA Turnpike and PA 309 Type of Work: Utility Work. There will be a rolling stop with a traffic slowdown on US 22 East and West for roadwork. Traffic on the PA 309 North to US 22 West ramp and the PA Turnpike to US 22 East ramp will also experience a short-term traffic stoppage. START DATE: 09/05/2012  Est. Completion Date: 09/05/2012. Restrictions in effect 10 a.m. to 11 a.m.

Interstate 78

Between exit 60 (PA 309) and exit 57 (Lehigh Street). Lane restriction in both directions. Watch for stopped vehicle and use caution when traveling through work area. START DATE: 08/28/2012  Est. Completion Date: 08/28/2012. Restrictions in effect: 9 a.m to 2 p.m.


Get more local news delivered straight to your inbox. Sign up for free Patch newsletters and alerts.

We’ve removed the ability to reply as we work to make improvements. Learn more here