patching...
Welcome back, Patch Blogger!

PennDOT Road Work: Week of March 4

Plan your commutes.

 

The Pennsylvania Department of Transportation has scheduled road work in South Whitehall, Upper Macungie and North Whitehall:

South Whitehall

  • Road: Route 22 ramp to 15th Street
  • Type of Work: Crack sealing
  • Date: Wednesday, March 6, from 8 a.m. to 2 p.m.
  • Restriction: Ramp restrictions. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
  • Rain will cause delays.
  • Road: Route 22 ramps at Cedar Crest Boulevard
  • Type of Work: Crack sealing
  • Date: Tuesday, March 5, from 8 a.m. to 2 p.m.
  • Restriction: Ramp restrictions. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
  • Rain will cause delays.
  • Road: Tilghman Street ramps at Route 309
  • Type of Work: Crack sealing
  • Date: Thursday, March 7, from 8 a.m. to 2 p.m.
  • Restriction: Ramp restrictions. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
  • Rain will cause delays.

Upper Macungie/Weisenberg

  • Road: Interstate 78 between Route 863 and Route 100
  • Type of Work: Brush cutting
  • Date: Monday, March 4, from 9 a.m. to 3 p.m.
  • Restriction: Lane restriction westbound. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
  • Rain will cause delays.

Upper Macungie

  • Road: Route 100 between Hamilton Street and Route 78
  • Type of Work: Crack sealing
  • Date: Friday, March 8, from 7 a.m. to 3 p.m.
  • Restriction: Lane restriction with flagging. Motorists are urged to watch for stopped or slow-moving vehicles.
  • Rain will cause delays.
Related Topics: PennDOT road work

Leave a comment