The Pennsylvania Department of Transportation has scheduled road work in South Whitehall, Upper Macungie and North Whitehall:
South Whitehall
- Road: Route 22 ramp to 15th Street
- Type of Work: Crack sealing
- Date: Wednesday, March 6, from 8 a.m. to 2 p.m.
- Restriction: Ramp restrictions. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
- Rain will cause delays.
- Road: Route 22 ramps at Cedar Crest Boulevard
- Type of Work: Crack sealing
- Date: Tuesday, March 5, from 8 a.m. to 2 p.m.
- Restriction: Ramp restrictions. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
- Rain will cause delays.
- Road: Tilghman Street ramps at Route 309
- Type of Work: Crack sealing
- Date: Thursday, March 7, from 8 a.m. to 2 p.m.
- Restriction: Ramp restrictions. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
- Rain will cause delays.
Upper Macungie/Weisenberg
- Road: Interstate 78 between Route 863 and Route 100
- Type of Work: Brush cutting
- Date: Monday, March 4, from 9 a.m. to 3 p.m.
- Restriction: Lane restriction westbound. Motorists are urged to watch for stopped vehicles and to use caution when traveling through work areas.
- Rain will cause delays.
Upper Macungie
- Road: Route 100 between Hamilton Street and Route 78
- Type of Work: Crack sealing
- Date: Friday, March 8, from 7 a.m. to 3 p.m.
- Restriction: Lane restriction with flagging. Motorists are urged to watch for stopped or slow-moving vehicles.
- Rain will cause delays.